max .load : | |
---|---|
jib length: | |
free standing height: | |
max anchorage height: | |
mast size: | |
Availability: | |
Quantity: | |
Product Description
1-Product Description:
QTZ40-4808 building and construction equipment tower crane is a mini tower crane to lift various materials in construction field. It is characterized by creative design with rational structure and reliable operation. Its maximum load is 4t, tip load is 0.8t, jib length is 48m, and free standing height is 29m, maximum anchorage height can reach 120m. Equipped with all necessary safety devices, this construction equipment is superior to its counterparts not only in its original design, attractive appearance and secure operation but also in its extraordinary speed-control ability and work efficiency.
2-Specification
Series | QTZ40 | |
Standard Model | 4808 | |
Max. Lift Load | 4t | |
Tip Load | 0.8t | |
Free Standing Height | 29m | |
Max. Anchorage Height | 120m | |
Jib Length | 48m | |
Mast size | 1.5×1.5×2.2m | |
Lift Mechanism | Lifting Speed | (a=2)70/35/9 m/min (a=4)35/17.5/4.5m/min |
Lift motor | 15/15/4kw | |
Trolley Mechanism | Trolley speed | 39/26 m/min |
Trolley Motor | 1.5/2.2kw | |
Slewing Mechanism | Slewing speed | 0.72r/min |
Slew Motor | 3.7kw | |
Jacking Mechanism | Jack climbing speed | 0.4m/min |
Jack climbing motor | 4kw | |
Voltage | 380V/50Hz/3P | |
Luxury Operate Cabin, Schneider Electric Parts |
3-Product Feature
1)Hoisting Mechanism 3-Product Feature
Three-gear speed modulation by electrical motor or frequency conversion, giant winch.
2)Rotation Mechanism
Speed modulation with frequency conversion, stable break, accurate position, outstanding on performance and operation all around the world.
3) Trolley Mechanism
Speed modulation with frequency conversion, less concussion, stable operation.
4)Control System
PLC control, auto diagnosis on electric malfunction, corresponding alarm on light and sound, key components adopting international top brand product.
4-Safety Features
1 | Torque limiter | Control torque, it will warns when lifting weights reach to 90% of rated lifting torque. When reach to 110% of the rated lifting torque, it will limit rising upwards and trolley. |
2 | Weight limiter | Control the maximum lifting capacity, lifting weight reach to 40% of the rated capacity, limit high-speed lifting; lifting weight reach to 110% of the rated capacity, limit the lifting up |
3 | Height limiter | Control the lowest and highest extreme position of lifting hook |
4 | Slewing limiter | Control the extreme turns number of turn left and right |
5 | Amplitude limiter | Control trolley limit position of inward and outward |
6 | Overload protection | If the material is over the capacity, the crane will give a sharp warning for protection itself |
7 | Emergency brake | If the operation staff encounter some emergency situation, we could start the emergency brake system to protection the related treasure |
8 | Control Method | Room control or remote control to avoid any injury to the operation staff |
9 | Main lifting motor | with thermal protection and currency protection |
5-Product Details
6-Delivery, shipping and serving
Packaging: High quality seaworthy package, usually by 40HC container.
Delivery time: 25 working days after advance payment
7. FAQ:
If you are interested in our 4Ton Self Erection Construction Tower Crane, please no hesitate to contact us with following parameters:
1. Max load capacity?
2. Tip load?
3. Jib length?
4. Hoist lifting height?